• Home
    welcome
  • About
    who we are
  • Services
    what we do
  • Projects
    what we’ve done
  • Blog
    updates
  • Contact
    get in touch

Bon Thomas Stage 1

23 September 2020

Completed in 2018 for the City of Brimbank, this was the start of what is to be a major sports precinct in Deer Park. Again, as another successful project GHP have now been engaged to design the 2nd and 3rd stages of this project which should be constructed in 2020.

Optimized by: Netwizard SEO

Recent Posts

  • Urban Transformation and the Rise of Mixed-Use Development in Australia
  • Urban Design Geared Towards Sustainability
  • Understanding the Principles of Passive Design
  • The Significance of Drafting a Concept Plan in a Construction Project
  • An Overview of Master Planning and How It Benefits Construction Projects
  • 5 Main Aspects of a Feasibility Study in Construction
  • Understand the Difference between Planning and Building Permits
  • Check Out These Innovative and Practical Architectural Solutions
  • Architectural Job Costing: How It’s Done and Its Role in the Overall Success of a Project
  • How Architecture and Design Can Maximise Productivity in Office Spaces? (Part 1)

Navigation

  • Home
  • About Us
  • Services
  • Gallery
  • Blog
  • Contact Us
 
Facebook

Recent Posts

  • Urban Transformation and the Rise of Mixed-Use Development in Australia
  • Urban Design Geared Towards Sustainability
  • Understanding the Principles of Passive Design

Contact Us

3 Leveson St., North Melbourne VIC, Australia 3051
Ballarat Office – 205 Sim St Black Hill VIC, 3350
Phone: (03) 9329 2611
Mobile: 0438 533 160
Email: ghp@ghp.biz


Architecture Town & Regional Planning Environmental Design Project Management Urban Design

Copyright © 2022 Greenway Hirst Page Pty Ltd. All Rights Reserved.

Web Design by: Netwizard Design